First railway line in South India (Madras Railway, Royapuram-Arcot/Walajah Road) first train ran in 1856; track work began 1852
First connection. Limit: Year only. Owning railway gives no day. Source 1Source 2
Gujarat1860-02-10 day
First train run on BB&CI first section Amroli (near Surat)-Ankleshwar, 29 miles
First connection. Limit: Source says first section of BB&CI, not "first in Gujarat". Amroli, Surat and Ankleshwar are in Gujarat; no earlier Gujarat opening found in checked sources, so first-in-state is an inference. Page images of the table PDF could not be fetched (host returns 404 to direct download), so the table is text-extraction only; the 10 Feb 1860 date rests on the clean BB&CI book text. Source 1Source 2
Kerala1861-03-12 day
First railway line in Kerala: Beypore-Tirur 30.5 km opened
First connection. Limit: Doc states Tirur-Kuttippuram 1 May 1861 followed; also says track laying Podanur-Pattambi 1860 and Pattambi-Podanur opened 14 Apr (year not read), so check whether a Tamil Nadu-side section within Palakkad division predates Beypore-Tirur; Kerala firstness for Beypore-Tirur taken from the doc wording "first Railway line". Source
Gujarat1864-11-28 day
BB&CI Utran (near Surat)-Grant Road line inaugurated/opened with Surat-Bombay branch
First connection. Limit: Opening of the Bombay connection. Not first in Gujarat. BB&CI incorporation 1855 is not an opening. Source
North/East trunk1866 year
Calcutta (Howrah) linked with Delhi and Bombay via Allahabad - trunk connection between regions
First connection. Limit: PIB wording; exact day not given. Source
Haryana (Rewari)1873-02-14 day
Delhi-Rewari-Farukhnagar MG line (Rajputana Railway) opened
First connection. Limit: Doc says first MG line on Indian soil. Rewari/Farukhnagar are in Haryana; not claimed as first rail in Haryana (Ambala-area lines earlier, unchecked). Source
Rajasthan1874-10-12 day
Jaipur-Bandikui opened by Rajputana Malwa Railway; extended to Delhi 7 Dec 1874
First connection. Limit: Event only. Not proven to be the first railway in Rajasthan. Bandikui-Agra Fort 1874 is press-only (Patrika). Source
Assam1882 year
Dibru-Sadiya Railway (Assam Railways & Trading Co) first railway in Assam, Dibrugarh-Dinjan
First connection. Limit: Archived NFR history page (Wayback 2014 snapshot of nfr.railnet.gov.in History1.htm); year only. Source
Chhattisgarh1882 year
Chhattisgarh State Railway: Nagpur-Rajnandgaon 149 miles MG
First connection. Limit: Year only. Line starts at Nagpur (Maharashtra). Source
Goa1888 year
First railway line in Goa: West of India Portuguese Railway Mormugao-Castle Rock, metre gauge
First connection. Limit: Year B-level, single press source. Source
First passenger train ran Dekargaon/Harmuti (Assam) to Naharlagun; PIB archive says it brought Itanagar (capital) onto the railway map
First connection. Limit: Naharlagun is near, not in, Itanagar (PIB archive: "Naharlagun (near Itanagar)"). PIB factsheet says Naharlagun station commissioned April 2014 on 21.75 km Harmuti-Naharlagun line. Source 1Source 2
Meghalaya2014-11-29 day
Mendipathar-Guwahati first modern-network service flagged off 29 Nov 2014; Dudhnoi-Mendipathar project. This is not a settled first-ever railway claim for present-day Meghalaya.
First connection. Limit: PIB PMO 29 Nov 2014; PIB factsheet confirms 'first railway station 2014'. Mendipathar is a station in Meghalaya; this claim does not extend to Shillong. | Historicalfirstnessunderreview: reported 1886 Cherra-Companyganjlineat Tharia. See claim_disputes.csv; do not erase pre-statehood or narrow-gauge systems. Source
Arunachal Pradesh2015-02-20 day
PM flagged off Naharlagun-New Delhi AC Express and Naharlagun-Guwahati Intercity Express on 20 February 2015.
First connection. Limit: Separate flag-offs from the first Naharlagun passenger service in April 2014. Naharlagun is near Itanagar. Source
Mizoram2016 year
Kathakal-Bairabi 83.55 km BG; first freight (42 wagons of rice) and a passenger service flagged off virtually - broad gauge to Bairabi
First connection. Limit: Exact day not given. Source
Manipur2016-03 range/month or qualified date
Jiribam station converted from metre gauge to broad gauge under the 49.61 km Arunachal-Jiribam project; described as close to the Assam border
First connection. Limit: Gauge conversion of an existing station, not a first-ever rail arrival in Manipur. Source
Gatimaan Express launched2016-04-05
Exact date; FY 2016-17. 160 km/h maximum is not average commercial/network speed.
USBRL dedicated: 272 km, Chenab arch bridge, Anji cable-stayed bridge; Vande Bharat Katra-Srinagar flagged off - Jammu division and Kashmir Valley connected by rail for the first time
First connection. Limit: Post-event government release confirms dedication and flag-off. Not first rail ever in Jammu or Kashmir. Source
Mizoram2025-09-13 day
Bairabi-Sairang 51.38 km inaugurated by PM; Sairang station; Aizawl area on railway map - state capital region connected for first time
First connection. Limit: PIB 13 Sep 2025; Sairang is ~20 km from Aizawl, so say 'Aizawl area/capital region', not 'Aizawl station'. Also https://www.pib.gov.in/PressReleasePage.aspx?PRID=2309650&lang=2®=48 . City-vs-nearby: Sairang is about 20 km from Aizawl; the station is not in Aizawl city. Inauguration date 13 Sep 2025 is an inauguration; passenger service start not separated here. Source
Government briefing reports 99.2% BG electrified2025-11
As-of month, not full FY. Scope differs from ASS route-length table; not spliced into that series.