Nilgiri Mountain Railway

Metre-gauge mountain railway between Mettupalayam and Udagamandalam. Southern Railway distinguishes the Mettupalayam-Coonoor opening in 1899 from the extension to Ootacamund in 1908. UNESCO added the component in 2005 and describes rack-and-pinion traction.

Scope and limitsSource lengths differ: UNESCO gives 45.88 km, the Southern Railway profile 46.61 km and a workshop note 46 km. The 1899 opening covered the lower section only, and the 1908 extension reached Ootacamund. No live timetable or route geometry is given.

Also known as: NMR; Nilgiri Railway

Sources

whc.unesco.org · whc.unesco.org · sr.indianrailways.gov.in (PDF) · sr.indianrailways.gov.in (PDF)

Each source supports this entry only. It does not certify other attributes.

Source-specific claims

ClaimValuePrecisionSource
Mettupalayam-Coonoor opened for traffic1899-06-15day. Later Southern Railway divisional history; the original table was not independently checked. This is the opening of the lower section, not of the whole line to Ooty.sr.indianrailways.gov.in (PDF)
Nilgiri Railway / Progress of Construction table
Coonoor-Fernhill section opening1908-09-15day. Later Southern Railway divisional history; the original table was not independently checked. The broader 1908 extension year is also given in UNESCO's narrative.sr.indianrailways.gov.in (PDF)
Progress of Construction table
Fernhill-Ooty section opening1908-10-15day. Later Southern Railway divisional history; the original table was not independently checked.sr.indianrailways.gov.in (PDF)
Progress of Construction table
Length in UNESCO synthesis45.88km; source-specific. UNESCO's figure. The Southern Railway profile gives 46.61 km and a workshop note 46 km; the sources are not reconciled.whc.unesco.org
Outstanding Universal Value / Brief synthesis
Length in Southern Railway divisional profile46.61km; source-specific. The Southern Railway profile's figure, shown beside UNESCO's 45.88 km. Neither is treated as the single length.sr.indianrailways.gov.in (PDF)